- Location: Italy – Emilia Romagna
- Client: Autostrade per l’Italia S.p.A.
- Section: La Quercia – Badia Nuova
- Plant area: 5,800 m2
- Specialised staff: 93 units
- Daily production volume of precast segments: 570 mc/day
- Average daily segment production: 80, equivalent to 16 meters of tunnel rings
- Single segment weight: 17 tonnes
- Segment arch development: max. 5 meters
- Segment thickness: 70 cm
- Segment width: 2 meters
Prefabrication is the core activity for TOTO S.p.A. Costruzioni Generali. Toto has strategically chosen to integrate the prefabrication activity in order to: manage the entire process on the progress of work , ensure product quality and develop construction techniques for the purpouse of reducing the construction time & costs, as well as logistic equipment. High quality of the product, construction methodology, engineering specialization, R&D investment, use of cutting-edge materials and, last but not least in-house production of prefabricated elements in plants specifically made on site, are the distinctive elements of this business sector. The plant is close to the Sparvo Tunnel – A1 Valico Bypass – lots 6/7 – TOTO S.p.A. Costruzioni Generali has constructed one of the world’s largest plants for the production of precast segments which is a true excellence in the sector. The segment, about 17 tonnes, is made of reinforced concrete and is unique worldwide compared to the dimension of a standard element. The plant is divided into three distinct operating units. With the collaboration of professional technicians and workers, the average daily production rate reached 80/90 segments