- Location: Italy
- Client: Ferrovie dello Stato
- Project amount: € 3.869.947
Building works, railway tracks and electric system needed to widen the railway line on the bridge over the River Tagliamento from 97+954 km of the Mestre – Udine railway line.
The project comprises civil works, railway tracks and electrification works to construct a new bridge over the River Tagliamento.
The bridge is built using prestressed reinforced concrete box girders to replace the existing metal girders.
The new double track runs over the deck together with systems and technologies needed to electrify the line. The works are performed with the line in operation.